My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1992 01 06
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1992
>
AG 1992 01 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2003 11:09:03 AM
Creation date
11/27/2017 12:00:50 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/6/1992
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35.01 <br /> <br />-Install new closet large enough to house furnace. <br />and out and Paint. <br /> <br />Sheetrock closet inside <br /> Total 1,438. O0 <br /> <br />9. Electrical <br /> -Upgrade service to 100 amps. <br /> -Install light/vent combination in bath and vent through the roof. <br /> -Install GFI's in kitchen and bathroom. <br /> -Replace broken outlet in kitchen. <br /> -Install new smoke detector in living room. <br /> -Replace all outlet and switch plates. <br /> -Wire for furnace. <br /> <br />10. Basement <br /> -Install handrail along left side of stairway <br /> <br />Total 660. O0 <br /> <br />Total 8o. oo <br /> <br />,11. Exterior <br /> <br />1. Doors <br /> -Install new solid core front entrance door, all necessary hardware and <br /> dead bolt lock. <br /> -Install new solid core rear entrance door in basement, hardware and dead <br /> bolt lock. <br /> -Install new rear storm door. <br /> -Install new solid core door with dead bolt lock to side entrance. Install new <br /> screen door. <br /> Total 1,125.00 <br /> <br /> * Paint or stain all installed doore. ( Owner's Choice). Finger joint tdm may be <br /> used in lieu of solid thru for surfaces to be painted. Fill ail nail holes in tdm <br /> before painting <br /> ** All sheetrock work is to be puttied, taped and sanded as required. Ceiling <br /> to be textured white. Walls to be paneled in a light color. Interior walls of <br /> closets are to be rough finished only. <br />*** Contractor will be responsible for obtaining all permits. The house is <br /> occupied and will remain occupied. ( Figure accordingly). Contractor will <br /> clean up all extedor debris and leave inside broom clean. <br /> <br /> Total Estimated <br />Contractor's Signature: <br /> 3of3 <br /> <br />Cost 9,347.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.