Laserfiche WebLink
§136-44.5! ROADS AND <br /> <br /> Effect of A.mendments. -- The 19E9 <br />amendment, eft'octave July 7, ~989, ~n <br />~e ~ntro~uc~' land,ge of ~ub~ect~on <br />(~), in the fi~l sen~nce, ~ubstJtu~ "for <br />any thoro~g~re incluae~ ~s p~ of a <br />comprehensive pl~ for ~ee~ ~n~ h~gh- <br />w~y~ adop~ p~suant ~ G.S. ]36-66.2" <br />for "within ~ co~orz~ ]i~ and ~e <br />e~r~to~al j~sdiction of i~ b~lS- <br />ing pem)t ~ssuance ~ sub, vis)on con- <br />~o) or~n~s,~ adSe8 ~or ~ny potion <br />of ~e existing or proposed S~ high- <br />way ~y~m," ~nd ~dde~ the second sen- <br /> <br />HIGHWAYS §136-44.52 <br /> <br />tence; in .~ub~ivision (b)d), delete8 "for <br />municipal ~dop~ed maps, or, following <br />"city clerk," ~68ed "and" following ~ci~ <br />c]erk," and de]e~d "for S~ zdop~d <br />maps" roi]owing "~s~ict en~neer"; <br />pea)e8 ~o~ ~ubse~ion (c) rela~ng <br />roadway com8on or any potion <br />on an official mzp not being effe~ve <br />less specific requiremen~ ~e follow, ed; <br />~nd reSes)~a~ foyer subsection (c) <br />~ present subregion (~), and zSding the <br />)~ t~'o sen~nces of present <br />(d). <br /> <br />CASE NOTES <br /> <br /> Cited in B'-tch v. To~ of Chapel Hill, <br />92 N.C. App. 601,376 S.E.28 22 (1959% <br /> <br />§ 136-44.51. Effect of roadway corridor official <br /> map. <br />(al After a roadway corridor official map is filed with the register <br />of deeds, no building pe~,~it shall be issued for any building or <br />structure or part thereof located within the roadway corridor, nor <br />shah appro~.~ of a subdivision, as defined in G.S. ~53A-335 and <br />G.S. ]60A-3 ~6, be granted with respect to property within the road- <br />way corridor. The district engineer of ~he Highway District in <br />which the roadway Corridor is located shall be notified witl~n 10 <br />· days of all requests for building permits or subdivision approval <br />within the roadway corridor. The provisions of this section shall not <br />apply to valid building permits issued prior to August 7, 1987, or to <br />building permits for buildings and structures which existed prior to <br />the filing of the roadway corridor provided the size of the building <br />or structume is not increased and the ~'pe of building code occu- <br />pancy as set forth in the North Carolina Bui]ding Code is not <br /> changed. ' <br /> Co) No application for building permit issuance or subdivision <br /> plat approval shall be delayed by the provisions of this section for <br /> more than three years from the date of its original submittal. (1987, <br /> c. 747, s. 19.) <br /> <br />CASE .~OTES <br /> <br /> Cited in Batch v. To~-~ cf Chapel Hill, <br />92 N.C. App. 601,376 S.E.28 22 (39E9). <br /> <br />§ 136-44.52. Variance from roadway corridor offi- <br /> cial map. <br /> (al The Department of Transportation or the city which initiated <br />the .r?adway c.o.~idor .official map ~hall _establish procedures for <br />consioering pemions :or variance ~rom the requirements of G.S. <br />t36-44.51. <br />0al The procedure ,e, stab]ished by the State shall provide fo,r <br />ten notice to the .Ma.~ or and Chairman of the Board of Count~ Corn. <br /> <br />269 <br /> <br />33 <br /> <br /> <br />