My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1992 07 06
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1992
>
AG 1992 07 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:11:21 PM
Creation date
11/27/2017 12:01:59 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
7/6/1992
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 15 <br /> <br /> (5) in conformance with the standards for allowability of costs set <br /> <br /> forth in OMB Circular A-87, "Principles For Determining Costs <br /> Applicable to Grants and Contracts With State, Local, and Federally <br /> Recognized Indian Tribal Gover~mnts"; and <br /> <br /> (6) treated uniformly and consistently under accounting principles and <br /> procedures approved or prescribed by the Department. <br /> <br /> (d) Checks, Orders, and Vouchers. Any check or order drawn by the <br />Contractor with respect to any item which is or will be chargeable against <br />the Project Account will be drawn only in accordance with a properly signed <br />voucher then on file in the office of the Contractor stating in proper detail <br />the purpose for which such check or order is drawn. All checks, invoices, <br />contracts, vouchers, orders, or other accounting documents pertaining in <br />whole or in part to the Project shall be clearly identified, readily <br />accessible, and to the extent feasible kept separate and apart from all other <br />such documents. <br /> <br /> (e) Reports. The Contractor shall advise the Department regarding the <br />progress of the Project at such time and in such manner as the Department <br />may require throughout the useful life of the Project equipment as defined <br />in Section 12 herein. These reports shall be used, in part, to document <br />utilization of the Project equipment. Failure to carry out the requirements <br />set forth in this Section, or to fully utilize the project equipment in the <br />manner directed by the Department, shall constitute a breach of contract <br />and, after written notification by the Department, may result in termination <br />of the Agreement or any su~ remedy as the Department deems appropriate. <br /> <br /> The Department shall provide all instruction, guidance, or forms <br />necessary to prepare such reports. The Contractor shall retain the reports <br />for a period of three (3) years after the reporting period. The Department <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.