My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1992 10 05
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1992
>
AG 1992 10 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:12:06 PM
Creation date
11/27/2017 12:02:25 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/5/1992
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Charlotte Metro Studios <br /> Narrative <br /> <br />The location of the Charlotte Metro Studios will be in southern Cabarrus County. <br />The total size of the site is approximately 600 acres and located between Miami <br />Church Road and Highway 200. Access to the studio will be at the southernmost <br />tip of the site off Highway 200. <br /> <br />Charlotte Metro Studios will consist of five sound sages for a total of <br />approximately 76,200 square feet. Also included in the main studio complex phase <br />one: <br /> <br />Office and support areas, approximately 50,000 square feet <br /> <br />Carpentry Shops, approximately 7,000 square feet <br /> <br />Offices for Management Staff, Two screening rooms, Health Club, <br />approximately 14,000 square feet <br /> <br />Dining Facility and Food Service, approximately 5,000 square feet. <br /> <br />The Studio will also consist of a Child Care/Education Program and several <br />support and warehouse facilities. <br /> <br />Site circulation will include a main entrance road used both by employees and <br />visitors. Visitor parking will be located away from the sage area, but near the <br />front Management Staff Offices and lobby. A private perimeter employee/service <br />road will continue and loop the five stages and connect back to the main entrance <br />road. The Carpentry Shops and other future support buildings ~d stages will be <br />located off this perimeter service loop road. <br /> <br />An area of approximately 160 acres is to be rezoned C-3/SU which will include the <br />stages, offices, support areas, carpentry shops, and a proposed back lot for <br />exterior filming. <br /> <br />W I L K E R S O N A S S O C I A T E S <br /> <br />UI A R C H I T E C T $ rn <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.