My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1992 12 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1992
>
AG 1992 12 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:12:54 PM
Creation date
11/27/2017 12:02:36 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/21/1992
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Significant site preparation work including <br />clearing, excavation, or removal or existing <br />buildings, structures, or facilities which is <br />necessary for the replacement, assembly, or <br />installation of new source facilities or equipment; <br />or <br /> <br />Entered into a binding contractual obligation for the <br />purchase of facilities or equipment which are intended to <br />be used in its operation within a reasonable time. <br />Options to purchase or contracts which can be terminated <br />or modified without substantial obligation under this <br />definition in accordance with that Section with the <br />provisions as stated in 40 CFR 403.3.(K). <br /> <br />(a) Significant Industrial User Determination <br /> <br />Ail persons proposing to discharge nondomestic wastewater, or <br />proposing to change the volume or characteristics of an existing <br />discharge of nondomestic wastewater shall request from the <br />Executive Director a significant industrial user determination. If <br />the Executive Director determines or suspects that the proposed <br />discharge fits the significant industrial user criteria he will <br />require that a significant industrial user permit application be <br />filed. <br /> <br />(b) Significant Industrial User Permit Application <br /> <br />Users required to obtain a significant industrial user permit shall <br />complete and file with the Executive Director an application in the <br />form prescribed by the Executive Director, ahd accompanied by the <br />applicable fee in the amount prescribed in the Schedule of Charges <br />and Fees. Significant industrial users shall apply for a permit <br />within 90 days after notification of the Executive Director's <br />detezmination in (a) above. In support cf this application, the <br />user shall submit, in units and terms appropriate for evaluation, <br />the following information: <br /> <br />(1) Name, address, location, (if different from the address); <br /> <br />(2) Standard Industrial Classification (SIC) codes for <br />pretreatment, the industry as a whole, and any processes for <br />which categorical pretreatment standards have been <br />promulgated; <br /> <br />(3) Volume of wastewater to be discharged; <br /> <br />29 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.