My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19910204
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1991
>
AG19910204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:43 AM
Creation date
11/27/2017 12:02:55 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/4/1991
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
steam demand and energy consumption profile, including average and <br /> <br /> I peak hourly, dally, and monthly demand usages: <br /> · future energy consumption projections; <br /> <br /> · planned additions, modifications, or other changes to existing <br /> I plant; and <br /> <br /> I · electric power consumption profile <br /> <br /> 2. Fair market energy price analysis <br /> <br /> · evaluation of existing capital, O&M, and fuel costs; <br /> <br /> · future energy production costs, including consideration of any <br /> major additions or replacement of existing equipment and future <br /> I operating costs; <br /> <br /> I · identification of additional investments required by user due to <br /> participation as an energy market. <br /> I 3. Other technical considerations, including whether the steam supply must <br /> be firm or inteinuptible, the availability of a site and special <br />I construction consideratiens related to a steam transmission line. <br /> <br /> I 4.' Contractual and other considerations such as the ability of the energy <br /> market to make a long-term commitment. CDM has developed over fifteen <br /> energy COntracts for resource recovery facilities and is highly <br /> familiar with the controlling technical, economic, and legal issues. <br /> <br />I 5. Interests of the energy market to proceed with project implementation. <br /> <br />I 6. bocation of energy markets relative to the source of waste generation. <br />I Page 9 of 18 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.