Laserfiche WebLink
-' <br /> EARL COCHRAN & SON, INC. <br /> <br /> Conco~d, North Cato~a28025 CONSULTING ENGINEERING <br /> E, Coc~, &., P.E. ~) <br /> <br /> C~barrus County Commissioners <br /> Post Office Box 707 <br /> Concord, North Carolina 28026-0707 <br /> <br /> Attention: Mr Michael M. Ruffin, County Manager <br /> <br /> Gentlemen: <br /> <br /> subject: Alton Run Outfall0 Pump Station & Force Main <br /> Final Approval <br /> <br /> The Alton Run Project is in operation. Three items remain <br /> to be done and we will withhold a sufficient amount from the <br /> final payment to cover them. These ifems are pavement repair on <br /> 1-85, resurfacing on N.C. 73 and seeding and mulching repair work <br /> along the outfall. <br /> <br /> operational portion of the project was compl.eted within <br /> the time limit and the Cabarrus County Utility Department and I <br /> are well pleased with the work of the Contractor, Ramey, Inc. of <br /> Winston-Salem, North Carolina. <br /> <br /> The actual contract cost for the project is $918,729.53. <br /> This is $69,028.53 over the original bid price of $849,701.00. <br /> The major items listed below amounted to extras totalling <br /> $73,739.30; other items came in under the estimated quantities <br /> to balance this out. <br /> <br /> 1. Additional sewer lines totalling 1394.53' were installed <br /> to serve property on Trinity Church Road at a cost of <br /> $36,499.30. <br /> <br /> 2. Solid rock was encountered in crossing under Crisco Road <br /> and i-85. This required the construction of 112' more <br /> tunnel than was anticipated. This additional tunnel <br /> cost $25,984.00. <br /> <br /> 3. NCDOT required an additional 29' of 30" casing pipe <br /> under I-8S at a cost of $4,872.00. <br /> <br />I 4. The 30" bore under N.C. 73 was extended 38' to satisfy <br /> NCDOT requirements and to protect the 30" raw water line <br /> beside the hivhway at an additional cost of $6,384.00. <br /> <br />I We request that you approve change Order No. i for <br /> $69,028.53 covering the variations between the Actual Contract <br /> Cost and the Estimated Base Bid and authorize the final payment <br />I to the Contractor, based on the following conditions. <br /> 3 <br /> <br /> <br />