Laserfiche WebLink
AI~ENDMENT TO <br /> <br /> AGREEMENT BE1AVEEN CABARRUS COU~Y <br /> <br /> ~d <br /> <br /> HDR ENGIN~E~NO, INC. OF NOR~ CAROLINA <br /> <br /> (fo~erly ~R Ink'tincture, Inc. of North C~olina) <br /> <br /> for <br /> <br /> PROF~SIONAL ENG~E~NG S~VIC~ <br /> <br /> CODDLE C~EK ~ERVOIR <br /> (Seplember 8 198~ <br /> <br />Add ~e following as p~gmph 1.6 - Mitigation P]~ under S~fion 1 - BASIC SERVICe: <br /> 1.6 Miti~atlon Plan <br /> <br /> 1.6.1. Pre-Construction Phase. ~is effo~ will include items which should be <br /> ac~mplish~ before construction of the mitigation ~s begins, including 4esign ~d bid <br /> d~ument m~ification for ;itto~ shelf cons~cfion, c~rdination wi~ Forest Sen, i~ <br /> red.ding provision ~d ins~lation of pl~t malefi~s, c~rdination %fith ~ Cab~s <br /> Coun~ Mosquito Control ~d North C~olina Division of ~vironmen~ H~th red.ding <br /> fish ~d mosquito monitoring, ~d development of County d~umenls red.ding <br /> Pre~mation ~ds. <br /> <br /> 1.6.1.1. Design - Prep~tion of construction dawings of mitigation m~s beyond <br /> which have ~r~dy b~n done; planning and c~rdination for plating mitigation <br /> monilogng, elc. <br /> <br /> 1.6.1.1.1. De~gn of cut ~d fill ~s, including slo~s, volumes, ~d ~<ifi~fions for <br /> s~bilimfion ~d cover (mulch). <br /> <br /> 1.6.1.I.2. D~in~lion of Pre~m,ation ~ds, ~d prelimin~ ~aseline) review of ~ese <br /> <br /> <br />