Laserfiche WebLink
! <br /> <br /> 4. The total_cost of the contract would bc $2,200. <br />I 5. If thc option of having the consultants prepTM a final ~pon is chosen, that <br /> would add an additional $200 lo the cost of the project. <br /> <br />I 6. If we are chosen to provide services, a cost rcimbu.~able contract will be <br /> developed ,~th an ~nvoicc presented at thc conclu~on of the work, <br /> ~nclud~n§ all cos? rela~ed to the projec~ <br />I D. Sur~ma~y <br /> <br /> If th~s proposal is found lo be satisfactory by ~hc requesting agency, a con~zzct <br /> be~veen Czbar~us County and the Un, verity of Florth Carolina at Ch~rloHe will bc drawn <br /> up and execute~L <br /> <br /> <br />