My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19911118
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1991
>
AG19911118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:55 AM
Creation date
11/27/2017 12:04:08 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/18/1991
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 15 <br /> <br /> Applicable to grants and Contracts With State, Local, and Federally <br /> Recognized Indian Tribal governments"; and <br /> <br />(6) treated uniformly and consistently under accounting principles and <br /> procedures approved or prescribed by the Department. <br /> (d) Checks, Orders, and Vouchers. Any check or order drawn by the <br /> Contractor with respect to any item which is or will be chargeable against <br /> the Project Account will be drawn only in accordance with a properly signed <br /> voucher then on file in the office of the Contractor stating in proper detail <br /> the purpose for which such check or order is drawn. All checks, invoices, <br /> contracts, vouchers, orders, or other accounting documents pertaining in <br /> whole or in part to the Project shall be clearly identified, readily <br /> accessible, and to the extent feasible kept separate and apart from all other <br /> such documents. <br /> <br /> (el Reports. The Contractor shall advise the Department regarding the <br />progress of the Project at such time and in such manner as the Department <br />may require throughout the useful life of the Project equipment as defined <br />in Section 12 herein. These reports shall be used, in part, to document <br />utilization of the Project equipment. Failure ~o carry out the requirements <br />set forth in this Section, or to fully utilize the project equipment in the <br />manner directed by the Department, shall constitute a breach of contract <br />and, after written notification by the Department, may result in termination <br />of the Agreement or any such remedy as the Department deems appropriate. <br /> <br /> The Department shall provide all instruction, guidance, or forms <br />necessary to prepare such reports. The Contractor shall retain the reports <br />for a period of three (3) years after the reporting period. The Department <br />shall have the right to inspect such retained data as necessary. <br /> <br /> (fl Audits. In accordance with Office of Management and Budget (OMB) <br /> <br /> , <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.