Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
I <br />! <br /> <br /> PROJECT I SUMMARY <br /> <br /> I This project was given ninth priority based upon total number of <br /> customers served per linear foot of water main and the total cost <br /> per customer. This is part of the Midland Area that the Board has <br /> I been trying to extend water into, it is the area where the majority <br /> of responses to the survey cards was negative. This project would <br /> need to be completed prior to or congruently with project J. <br /> <br /> COST ESTIMATE SHEET - WATER MAIN CONSTRUCTION <br /> PROPOSED PROJECT I: JIM SOSSAMAN ROAD OFF HWY 601 <br /> <br /> ITEM NO. DESCRIPTION QUANTITY UNIT PRICE EXTENSION <br /> <br /> A 12" X 6" TAPPING <br />I SLEEVE R VALVE 1 EA 1800.00 $1,800.00 <br /> B 6" WATER MAIN 2000 LF 13.00 $26,000.00 <br /> C 6" GATE VALVE 3 EA 350.00 $1,050.00 <br />I D FIRE HYDRANTS <br /> W/GATE VALVE 3 EA 1400.00 $4,200.00 <br /> <br /> CONSTRUCTION COST $31,250.00 <br />ISURVEYING & ENGINEERING $2,000.00 <br /> LEGAL & ADMINISTRATIVE $625.00 <br /> CONTINGENCIES $937.50 <br /> <br /> TOTAL PROJECT COST $34,812.50 <br />I4 POTENTIAL CUSTOMERS COST PER CUSTOMER $8,703.13 <br /> <br /> <br />