Laserfiche WebLink
I <br /> I <br /> i PROJECT J SUMMARY <br /> <br /> i This project was given tenth priority based upon total number of <br /> customers served per linear foot of water main and the total cost <br /> per customer. This is part of the Midland Area that the Board has <br /> been trying to extend water into, it is the area where the majority <br /> of responses to the survey cards was negative. This project would <br /> need to be completed congruently or after project I. <br /> <br /> COST ESTIMATE SHEET - WATER MAIN CONSTRUCTION <br /> PROPOSED PROJEG'T J: SPRING DRIVE OFF JIM SOSSA~4AN ROAD <br /> <br /> ITEM NO. DESCRIPTION QUANTITY UNIT PRICE EXTENSION <br /> <br /> I A 6" WATER MAIN 1000 LF 13.00 $13,000.00 <br /> B 2" WATER MAIN 850 LF 9.00 '$7,650.00 <br /> C 2" GATE VALVE i EA 250.00 $250.00 <br />i D FIRE HYDRANTS <br /> W/GATE VALVE 1 EA 1400.00 $1,400.00 <br /> E 1" BLOW-OFF 1 EA 500.00 $500.00 <br /> <br />I CONSTRUCTION COST $22,800.00 <br /> SURVEYING & ENGINEERING $1,850.00 <br /> LEGAL & ADMINISTRATIVE $456.00 <br />I CONTINGENCIES $684.00 <br /> <br /> TOTAL PROJECT COST $25,790.00 <br />I 7 POTENTIAL CUSTOMERS COST PER CUSTOMER $3,684.29 <br /> <br /> <br />