Laserfiche WebLink
MEMORANDUM <br />Page 2 <br />January 10, 1990 <br /> <br /> E) Have Talbert & Cox prepare a written professional opinion on <br /> the margin of' error on their Sound study. Estimate cost <br /> impact of inverse condemnation class action suit and relocation <br /> costs for h~,mes'on Ivey Cline Road, Mistyw0od and Twin <br /> CreeKs if the sound study estimate ~s wrong. We need a clear <br /> basis for action against the engineer if their sound study ~s <br /> wrong and we have to purchase $4 or $5 million in homes. <br /> <br /> On the Office building, the soil b6ring hit the-minimum <br /> specification of 10,000 on several locations. After construction <br /> began the actual soil found was below 10,000. The County <br /> paid the difference. We cannot let that happen on this sound <br /> study. It is the biggest risk the Board will face on the project. <br /> <br /> This information will provide a good basis for the next step in the decision <br />process and help planning of future expenditures. <br /> <br />Bs/ffs <br /> <br /> <br />