My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19900205
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1990
>
AG19900205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:37 AM
Creation date
11/27/2017 12:04:31 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/5/1990
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cHANGE I)isl,il, ulio,, <br /> ORDFR OWNER [] Mike Ruffin, Cabarrus County <br /> ARCIIIIECT [] Dennis YateS, Denhis Yates Associates <br /> AIA DOCUMEHf G701 CONTRACTOR [] Chris Payne, StrouP Sheet ~etal Works, Inc. <br /> HELl) [] Chuck Patterson, Stroup Sheet Metal Works, Inc <br /> O]~ IER [] Blair Bennett, Cabarrus County <br /> <br /> PR¢)IECT: Cabarrus County Public Health Facili~MiANG£ ORI)ER NUMBER: ! <br /> fl~,.ne, alldm~l Concord, North Carolina <br /> INIIIA'IION DA]E: January 30, 1990 <br /> '1 () (Conlraclor): <br /> <br /> ~- ~ ARCHITECT'S PROJECT NO: <br /> I Commission No. 89012.00 <br /> Stroup Sheet Metal Works, Inc. CONTRACT FOR: Re-roofing <br /> P.O. Box 6276 <br /> Asheville. N.C. 28816 <br /> ~ ] CONTRACT DATE: ~%v~r 6, 1989 <br /> <br /> Yoo me (Hl(,(:lcd lu make the lollowing chartres in this Conlrach <br /> <br /> 1) An additional pressure-treated 2x wood nailer shall be anchored to the preceding <br /> wood nailer (as detailed in the original contract documents) with 16 penny, <br /> cement-coated nails, Anchorage of wood blocking shall be installed to resist a <br /> force of 175 pounds per lineal foot in any direction. Half inch vent spaces <br /> shall be provided between each length of wood nailer. <br /> <br /> 2) An additional six inch "stretch-out" strip of PVC roof membrane flashing-materials <br /> will be furnished and installed at parapet locations to accommodate the extra <br /> thickness of the additional wood blocking. The six inch PVC strip shall be adhered <br /> to the parapet walls with Sarnafil Sarnacol #2170 bonding adhesive at a coverage <br /> rate of approximately 50 square feet per gallon. <br /> <br /> 3) The additional six inch PVC strip shall then be heat-welded to the remainder of <br />"- the previously installed flashing material. All heat welding will be accomplished <br /> with hand-held heat guns. <br /> <br /> 4) This will allow us to furnish and install the W.P. Hickmae Company Perma-Snap <br /> coping system in the original configurations and sizes detailed. <br /> <br /> 5) The additioeal pressure-treated 2x wood nailer shall also be anchored to the <br /> preceding wood nailer with 2½" #12 wood screws at 36!' on center approximately. <br /> <br /> 6) Time extension of fifteen {15) days requeste6 due to inclamentw~ather. <br /> <br /> I I,e r)rifiin,,I (C, mlracl Sma1 ((MK,X, MN~3R~4~i~K~CX)~X~ Was .......................... $ 85. 200.00 <br /> W(,f (h,ml:t~ I)y ilmvinu~ly a[lllioHze(I Change Or(fe~5 .................................. $ -0- <br /> 1he ICelllhU'l 5tllll} X~X~E~x~I~ prior 1o lids Challge Order was .......... $ 85,200.00 <br /> <br /> J}y Ibis CJlnngo Or(Jur ......................................................... $ 2,07~.00 <br /> 'ihe new rCnlllrncI SIIIi{} [~H~H~X{~R~ JlldedJllg Ibis Change Order will be ... $ 87,274. O0 <br /> <br /> ]J,e {)a{e gf SehshliilJ,d C(n11{)Jelion ,ms (,{ Ihc dale (ff {his C{}an~e O[(Ju~ IhereJore }s Feb~ 12, 1990. <br /> AulJlorized: <br /> Dennis Yates & Assoc. Stroup Sheet Metal Works, Inc. Gabarrus County <br /> ~, :tmi('t ()~f~ Box ?07 <br /> f~ SprinK Street, "W <br /> <br /> ~YGhris Payee - Ass t. V.P. <br /> DAlE January 30. 1990 DAr[ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.