My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19890116
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1989
>
AG19890116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:29 AM
Creation date
11/27/2017 12:06:15 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/16/1989
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~--~! '-" ~' ~i CAMP DRESSER & McKEE <br /> December 29, 1988 <br /> <br /> Dr. William F. Pilkington <br /> Health Director <br /> Cabarrus County HealthDepartment <br /> Post Office Box 1149 <br /> Concord, North Carolina 28026-1149 <br /> <br /> Contract Amendment for <br /> Consultin~A~reement <br /> <br /> Dear Dr. Pilkington: <br /> <br /> The purpose of this letter is to receive authorization to increase the <br /> upper limit of our consulting agreement for extra services related to the <br /> design and construction services for the second sedimentation basin at the <br /> Cabarrus County landfill. The current upper limit for the consulting <br /> agreement is $7,500. The original scope of services associated with this <br /> fee included the preparation of drawings and specifications for the new <br /> sedimentation basln, and our meetings to discuss a long range plan for <br /> solid waste in the County. Our original estimated cost for preparation of <br /> the drawings and specifications was based upon making only minor <br /> modifications to the drawings and specifications which we prepared for the <br /> first sedimentation basin. As a result of our experience with the <br /> construction of the first basin, however, we ~tually agreed to change both <br /> the design of the sedimentation basin and the coordination/contracting of <br /> geotechnlcal engineering services. In 'addition, we agreed to add <br /> geotechnical field work and a soils report on basin construction methods, <br /> as well as supervision of field inspection by Soil & Material E~gineecs to <br /> our contract. This was done to improve coordination of all engineering <br /> work. The County contracted directly for geotecbnlcal services on the <br /> first basin. <br /> <br /> Our additional costs, therefore, relate to: unanticipated design changes <br /> which had to be made to the drawings and specifications; the coordination <br /> and contracting with a geotechnical engineering firm to perform field work, <br /> a soils report, and inspection services; and, the geotechnical firm's fee <br /> which we subcontracted for directly (not including znspect~on services). <br /> Our total incurred costs for these extra services has been $11,575. <br /> Therefore, the new upper limit engineering services fee will be $19,075. <br /> <br /> If you have any questions regarding this request, please do not hesitate to <br /> call me. If not, please provide an authorizing signature in the space <br /> below and return two copies t~ me. <br /> <br /> We appreciate the opportunity to continue to serve Cabarrus County. <br /> <br /> Very truly yours, <br /> <br /> ca~ D~SSE~ ?~c~E~.~ <br /> <br /> /~hn L. Rbber~s, P.E. For Cabarrus County <br />~..!: ~ V~ce President <br />~ -0LR:tas Date <br />' <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.