Laserfiche WebLink
City of Concord <br /> Planning and Community Development <br /> <br /> WORK WRITE-UP <br /> AND CO~T ESTIMATE <br /> <br />Data: July 27, 1989 <br /> <br />Name: Addie McCullouqh (Marshall) <br /> <br />Address: 181 Stone Avenue <br /> <br /> Concord, N.C. ~3025 <br /> <br />Telephone: 784-2954 <br /> <br />Tenant: N/A Telephone: N/A <br /> <br />Item Line Item <br />Number Work to be Performed Bid Price <br /> <br /> Electrical: <br /> <br /> 1. Total new electrical service. (See specs.) <br /> 3 outlets per room, 1 outlet right side of <br /> sink in kitchen, 2 outlets over new base <br /> cabinets, 6 overhead light fixtures <br /> <br /> 2 bulb-type with wall switches, 1 outlet <br /> near ~ in bathroom - install outside <br /> fixture back entrance with switch~ all <br /> wiring and fixtures shall be new. Service <br /> shall comply with code. Contractor <br /> responsible for inspection. $ 1625.00 <br /> <br /> Bathroom: <br /> <br /> 2. Install fiberglass tub kit (white]. <br /> 378.00 <br /> <br /> Page 1 of 5 <br /> <br /> <br />