Laserfiche WebLink
4) The County agrees to support the permit limitation or condition <br /> imposed upon a discharger. <br /> <br />5) If the County needs to impose any special conditions upon a <br /> specific discharger~ such as the requirement to equalize flow to <br /> protect sewer lines~ the County must notify the discharger and the <br /> City. The City shall include these special conditions in the Permit. <br /> <br />6) The City agrees to provide the County with copies of all permits <br /> and copies of all correspondence for non-domestic dischargers <br /> connected to the Countyts wastewater collection system. <br /> <br />7) The County agrees to random and investigative inspections and <br /> sampling of wastewater of any non-domestic dischargers served by the <br /> County and further agrees to provide any and all records relating to <br /> water use and wastewater discharges by non-domestic users for the <br /> purpose of validation of monitoring records and compliance with <br /> Pretreatment Standards and Requirements. <br /> <br /> Section B- Surcharge Pro,ram <br /> <br /> The City shall include in the Sewer Use Ordinance the allowable <br />treatment plant influent design discharge limits for BOD~ COD~ TSS and NH3. <br />Provided the Rocky River Regional Wastewater Treatment Plant has adequate <br />capacity and the capability to comply with the NPDES Permit~ a non-domestic <br />discharger will be permitted to discharge in excess of the design limits <br />provided a surcharge is paid and there is no adverse impact on the Rocky <br />River Regional Wastewater Treatment Plant or its operation. <br /> <br /> Section C- Compensation <br /> <br />1) The City will establish the basis for a Surcharge Rate Structure <br /> end the City will review and update the surcharge rate as necessary to <br /> comply with the ordinance and to recover all the cost incurred by the <br /> excess loadings (i.e. Surcharge Fees). <br /> <br />2) The City will include in and as a separate part of the Surcharge <br /> Rate Schedule Program~ a Rate Schedule which shall recover the cost for <br /> performing the Pretreatment and Surcharge Program activities (i.e. <br /> Program Fees and Sample Fees). <br /> <br /> <br />