Laserfiche WebLink
'May 10, 1988 <br /> Page 5 of <br /> <br /> Engineer in writing to terminate all work on project. The Owner will pay <br /> the Engineer on an hourly basis for all work completed. <br /> <br /> Since the Engineer has no control over the cost of labor, materials or <br /> equipment, or over the Contractor's methods of determining prices, or over <br /> competitive bidding or market conditions, the estimates of construction <br /> cost p~ovided for herein are to be made on the basis of his experience <br /> and qualifications and represent his best judgment as a design professional <br /> familiar with the construction industry, but the Engineer cannot and does <br /> not guarantee that bids or the project construction cost will not vary <br /> from cost estimates prepared by him. <br /> <br /> ACCEPTED BY OWNER ACCEPTED BY ENGINEER <br /> <br />~ames W. Lentz, Chairman W.E. Cochran, Jr., Pr~ident <br />Cabarrus County Commissioners W. Earl Cochran & Son, Inc. <br /> <br />Date Date~ <br /> <br /> <br />