Laserfiche WebLink
-4- <br /> <br /> 4. It is understood and agreed that the Applicant ~and other parties may <br /> discharge sewage into the prop6s~d line or lines only under and in <br /> accordance with the standard rules and regulations of the County ,or <br /> as such regulations may be amended, with reference to users of the <br /> County Sewe~6ge System, particularly with reference to th~ payment <br /> of standard sewage service charges which are assessed by the County <br /> against users of its sewerage system, provided that any parties dis- <br /> charging sewage into the proposed line or lines'and who do not obtain <br /> their water supply from the Cabarrus County Utility Department shall <br /> meter their water system with a metering device approved by the <br /> Cabarrus County Utility Department, for the purpose of determining <br /> sewer service charges; such sewage service ch'arges shall be collected <br /> by and paid directly to the Cabarrus County Utility Department. <br /> <br /> 5. Any c6nnections, additions, or extensions to the herein described <br /> sanitary sewer lines shall .he made 6nl~ upoH written permission of <br /> the County. Such connections, additions, or extensions of the herein <br /> described sewer lines shall not be subject to any sanitary sewer <br /> connection privilege fees payable to this agreement. <br /> <br /> 6. The Applicant shall obtain all rights-of-way in widths satisfactory <br /> to the County Engineer where sewer lines are constructed across lands <br /> of the Applicant or others and being located in other than a publio <br /> way. The Applicant or others and being located in other than a public <br /> way. The Applicant shall show satisfactory evidence that he has <br /> obtained and recorded in the Cabarrus County ~egistry, proper agree- <br /> ments covering rights-of-way and that the same is free and clear of <br /> encumbrances. <br /> <br />7. The Applicant shall employ at his own proper cost and expense a <br /> Profesional Engineer registered in North Carolina who shall design, <br /> lay out and supervise the construction of these certain sanitary <br /> sewer lines, including any lift stations and force mains that may be <br /> required. Complete plans and profiles detailing all proposed eonstruct- <br /> lon and equipment must be approved by the County Engineer prior to <br /> beginning any construction. Said construction plans shall be prepared <br /> to County standard plan and profile. <br /> <br />8. The Applicant furthers agrees that upon approval of said Contractor <br /> and sanitary sewer plans, by the County Engineer~ the owner of said <br /> properties requesting sanitary sewer shall guarantee t~ installation <br /> of the required sanitary sewerage system. Upon completion of the <br /> sewerage system as described, written notice thereof shall be given <br /> by the Applican~ to the County Engineer, who shall cause a final <br /> inspection of the sewerage system to be made and shall withi~ thirty <br /> (30) days accept the system for the County, provided.all stipulations <br /> of this contract have been met. <br /> <br /> <br />