Laserfiche WebLink
-5- <br /> <br /> Aftor completion Of all construction, th~ Applicant shall furnish the <br /> original drawings of all construction plans, revised to show any and <br /> all revisions encountered during construction, to the Cabarrus County <br /> Utility Department marked "AsCBuilt,,. The final plans shall show the <br /> actua~ condition in which the f~cility was physically constructed and <br /> /or installed. Furfher, the final plans shall show the correct location <br /> of the facility as it relates to easements, right-ofTway lines, property <br /> lines, buildings, underground and/or 6verhead utility lines, roadways, <br /> railroads, and all other physical features that would have any effect <br /> or influence upon the constructed facility. The Professional Engineer <br /> employe.d to design the facility shall be responsible for the accuracy <br /> and completeness of the facility as shown on the final edition of the <br /> orlginal construction plans..- These original drawings shall become the <br /> property of the' County. <br /> <br /> 10. It is further understdod and agreed that if any of the above described <br /> sewer lines are served by or connected in any manner.~to pressure lines <br /> of lift stationb, the d~sign of such pressure lines and lift stations <br /> shall be in accordance with the requirements of the Cabarru~ County <br /> Utility Department and shall be designed to cover any future expansion <br /> necessary to accomodate all anticipated flows in the drainage area in <br /> which the lines are 16cated. <br /> <br /> ll. It is understood and agreed that when the described sewer system is <br /> constructed according to the plans, specifications, and standards of <br /> the Cabarrus County U~ility Department, said sewer system shall <br /> automaticaliy become the property 'of the Courtly without cost to the <br /> County, and without further agreement in connection therewith. <br /> <br />12. The Applicant, having constructed the aforesaid sanitary sewer at' his <br /> own proper cost and expense and outside the County's standard policy <br /> for sewer extensions, agrees to waive all claims for compensation 'or <br /> monies refundable .for any capital facilities constructed. <br /> <br />13. Indemnification of the County. The Contract~/Developer will indemnify, <br /> hold harmless and keep harmless, the County and.its agents and employees <br /> frdm and against all claims, damages, losses, and expenses - including <br /> attorney's fees - arising out of or resulfing from the performance of <br /> the work, provided that any such claim, damage, loss or expense is <br /> attributable to bodily i~jury, s~ckness, disease or death, or to inj~ry <br /> to or dgstruction of tangible property including the loss of use <br /> resulting therefrom, and is caused in whole or. in part by any negligent <br /> or willful.act or omission of the DEVELOPER, CONTRACTOK, and <br /> SUBCONTRACTOR(S), or anyone directly or indirectly employed by any of <br /> them or anyone for whose acts any of them may .be liable. <br /> <br /> <br />