My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19880815
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1988
>
AG19880815
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:18 AM
Creation date
11/27/2017 12:08:28 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/15/1988
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. It is understood and agreed that th~ Applicant ~nd other parties may <br /> discharge sewage into the proposed liDe or ].ines only under and in <br /> accordance with the standard rules and regulations of the County,or <br /> as such regulations may be amended, with referee%ce ti) users Of the <br /> County Sewerage System, particularly with refere~ce to the payment <br /> of'standard sewage service charges which are assessed by the County <br /> against users of its sewerage syssem, provided that any parties dis- <br /> charging sewage into the proposed line or lines and who do not obtain <br /> their wa~er supply from the Cabarrus County Utility Department shall <br /> meter their water system with a metering device approved by the <br /> Cabarrus County Utility Department, f6r the purpose of determining <br /> sewer service charges; such sewage service charges shall be collected <br /> by and paid directly to the Cabarrus County Utility Department. <br /> <br /> 5. Any coenections, additions, or extension~ to the herein described <br /> sanitary sewer lines shall be made only upon written permission of <br /> the County. Such connections, additions, or extensions of the herein <br /> described, sewer lines shall not be subjec~ to any sanitary sewe~ <br /> connection privilege fees payable ~o this agreement. <br /> <br /> 6. The Applicant shall obtain all rights-of-way in widths satisfactory <br /> to the County Engineer where sewer lines are constructed across lands <br /> of the Applicant or others and being located in other than a public <br /> way. The Applicant or others and being located in other than a public <br /> way. The Applicant shall show satisfactory evidence that he has <br /> obtained and recorded in the Cabarrus County Registry, proper agree- <br /> ments covering rights-of-way and that the same is free and clear of <br /> encumbrances. <br /> <br />7. The Applicant Shall emp%oy at his ow~ proper cost and expense a <br /> Profesional Engineer registered in North-Carolina who shall design, <br /> 1Ay out and supervise the con'struction of thes~ certain ~anitafy <br /> sewer lines, inoluding any lift.stations and force mains kh~t may be <br /> ~equired. Completg plans and profiles detailing.all proposed' do~s~ruct- <br /> ion 'and equipment must. be approved by the County~Engineer prior to <br /> beginning any construction. Said construction plans shall be prepared <br /> to County standard plan and profile. <br /> <br />8. The Applicant furthers agrees that upon approval of said Contractor <br /> and sanitary sewer plans, by the County Engineer, the owner of said <br /> properties requesting sanitary sewer shall guarantee the installation <br /> of the required sanitary..sewerage system. Upon comple~on of the <br /> sewerage system as described, written notice thereof shall be given <br /> by the Applicant to the County Engineer, who shall cause a final <br /> inspection Of the sewerage system to be made and shall withi~ thirty <br /> (30) days accept the. system for the County, provided all stipulations <br /> of this contract have been met <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.