My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19880815
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1988
>
AG19880815
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:18 AM
Creation date
11/27/2017 12:08:28 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/15/1988
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br /> <br /> 9. After completion o£ all construction, the Applicant shall furnish the <br /> original drawings of all constructiol] plans, revised to show any and <br /> all revisions encountered during construction, to the Cabarrus County <br /> Utility DepaMtment marked "As-Built,,. The final plans shall show the <br /> actual condition in which the.facility was physically constructed a~d <br /> /or installed. Further, the final plans shall show the correct location <br /> of the facility as it relates to easements, right-of-way lines, property <br /> lines, buildings, underground and/or overhead utility lines, roadways, <br /> railroads, and all other physichl features that would have any effect <br /> or infldence upon the constructed facility. The Professional Engmneer <br /> employed to design the facility shall be responsible for the accuracy <br /> and completeness of the facility as shown on the final edition of the <br /> original construction plans. These original drawings shall become the <br /> property of the County. <br /> <br /> 10. It is further understood arid agreed that'if any of the above described <br /> sewer lines are served by or connected in any manner to pressure lines <br /> of lift stations, the design of such pressure lines and lift stations <br /> shall be in accordance with the requirements of the Cabarrus County <br /> Utility Department and shall be' designed to cover any future expanslon <br /> necessary to accomodate all anticipated flows in the drainage area in <br /> which th~ lines are ldcated. <br /> <br /> ll. It is understood and agreed that when the described sewer system is <br /> constructed according co the plans, specifications, and standards of <br /> the Cabarrus County Utility Department, said sewer system shall <br /> automatically become the property of the County without cost to the <br /> CouuEy, and without further agreement in connection therewith. <br /> <br />12. The Applicant, having constructed the aforesaid sanitary sewer at his <br /> own proper cost and expense and outside ~he County,s standard policy <br /> for sewer extensions, agrees.to waive all claims for compensation or <br /> monies refundable .for any capi~al'facitities con§tructed. <br /> <br />13. Indemnification of the County. The Contract~f/Daveloper will indemnify, <br /> hold harmless and keep harmless, the County and.its agents and employees <br /> from and against al/ claims, damages, losse% and expenses - inci~didg <br /> attorney's'~aes _ .arising OUt of or resulting from the performance of <br /> the work, provided that any such claim, damage, loss or expense is <br /> attributable to bodily injury, s~ckness, disease or death, or to injury <br /> to or d~s'truction of tangible property including, the loss of use <br /> resulting therefrom, and is caused in whole or in part by any negligent <br /> or willfu~..aet or omission of the DEVELOPER, CONTRACTOR, and <br /> SUBCONTRACTOR(S), or anyone directly or indirectly employed by any of <br /> them or anyone for whose acts any of them may .be liable. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.