My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19880919
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1988
>
AG19880919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:18 AM
Creation date
11/27/2017 12:08:34 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/19/1988
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> <br /> 4. It is understood and agreed that the Applicant and other parties <br /> discharge sewage into the proposed line or lines only under and in <br /> accordance with the standard rules and regulations of the County,or <br /> as such regulations may be amended, with reference to users of th~ <br /> County SewerAge System, particul'arly wifh reference to the payment <br /> of standard sewage service charges which are assessed by the County <br /> against users of its s~werage system, provided that any parties dis- <br /> charging sewage into the proposed line or lines an~ who do not obtain <br /> their water supply from the C~barrus County Utility Department shall <br /> meter their water system with a metering device approved by the <br /> Cabarrus County Utility Department, for the purpose of determining <br /> sewer.service charges; suchsewage service charges shall be collected <br /> by and paid directly to the Cabarrus County Utility Department. <br /> <br /> 5. Any connections, additions, or extensions to th~ herein described <br /> sanitary sewer lines shall be made only upon written permission of <br /> the County. Such connections, additions, or extensions of the herein <br /> described sewer lines shall not be subject to any sanitary sewer <br />~ connection privilege fees payable to this agreement. <br /> <br /> 6. The Applicant shall ohtainall rights-of-way in widths satisfactory <br />~. to the County Engineer where sewer lines are constructed across lands <br /> of the Applicant or others and being located in other than a public <br /> way. The Applicant or others and being located'in other than a public <br /> way. The Applicant shallshow satisfactory evidence that he has <br /> obtained and recorded in the Cabarrus County Registry, proper agree- <br /> ments covering rights-of-way and that the same is free and clear of <br /> encumbrances. <br /> <br /> 7. Th~ Applicant shall employ at his ow~ proper cost and expense a <br /> Profesional Engineer registered in North Carolina who-shall design, <br /> lay out and supervipe the construction ~'~h~s~ 'certain ~anitaky <br /> sewer lines, including any lift stations and force mains that ~ay be <br /> ~equired. Complete ~lans and profiles detailing alI proposed Cons~ruct- <br /> mon and equipment must be approved by the County.Engineer prior to <br /> beginning any construction. Said construction plans shall be prepared <br /> to County standard plan and profile. <br /> <br /> 8. The Applicant furthers agrees that upon approval of said Contractor <br /> and sani~9~! sewer plans by the County. Engineer, the Owner of said <br /> properties requestingsanitary sewer shall guarantee th~ installation <br /> of. the required sanitary sewerage syst6m. Upon completion of the <br /> sewerage system as described, written notice thdrcof shall be given <br /> by theApplicant to the.County Engineer, who shall cause a.final <br /> inspection of the sewerage system to be made and shall withi~ thirty <br /> (30) days accept the system for the County, provided all stipulations <br /> of this comtract have been met. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.