Laserfiche WebLink
9. After completion o[ all constructio., the Appliua~t shall furnish th~ <br /> original drawings of all construction plans, revised to show any ~nd <br /> all revisions encountered durin9 constructi0n,.to' the Cabarrus County <br /> Utility D~p~rt~ent ma~ed ~;As-Buil~". The final plAnsshal~ show the <br /> actual condition in which the facility was physically constructed and <br /> /or-installed. Further, the final plans shall sh6w the co~rect location <br /> of the facility as it.'~lat~s to easements, rightrof-way ~ines, property <br /> lines buildings, underground and/or overhead utility lines, roadways, <br /> r~ilroads, and all o~her physical features ~hat w0~i4 have any effect <br /> or influence upon the constructed facility. The Professional Engineer <br /> employe~ to design the facility shall be responsible for the accuracy <br /> and completeness of the facility as shown on the final edition of the <br /> original construction plans.~. These original drawings shall become the <br /> property of the County. <br /> <br /> 10. It is further ond~r~tood and agreed that if any Of the above descried <br /> sewer lines are served by or connected in any manner to pressure lines <br /> of lift stations, the design of such pressure lines and' lift stations <br /> shall be in accordance with the requirements of the Cabarr~s County <br /> Utility Dep~rtmeet and shall be designed to cover any future expansion <br /> necessary to accomodate all anticipated flows in the drainage area in <br /> which the lines are l~cated. <br /> <br /> 11. it is understood and agreed that when the described sewer system <br /> constructed according to the plans, specifications, and.sta~%dards of <br /> the CabarrusCounty Utility Department,'said sewer system shall <br /> automatically become the property 6f the County without cost to the <br /> County, and without further agreement inconnection therewith. <br /> <br />12. The Applicant, having ~onstructed t~e afores'aid sanitary sewer at his <br /> own proper cost and expense and outside the County's standard policy <br /> for sewer extensions{ agrees.to waive all claims for compensation or <br /> monies refundable .for a~ycapital facilities constructed. <br /> <br />13. Inde~ification of theCo~nty- The Contract6~/Degeloper will indemnify, <br /> hold harmless and keep'h~rmless, the County and.its agents and employees <br /> from and against all'claims, damages, losses, and ~xpenses - including <br /> attorney's fees - arising out of or resulting from th'e performance of <br /> the work, provlded that any such claim,ldamage, loss or expense is <br /> attributable'to bodily injury~ sickness, disease or death, or to injury <br /> to or destruction of tangible proper~y including the io~S 6f use <br /> resul~i~§ therefrom, and is c~used in Qhole or in part by any negligent <br /> or willful act or omission 6f the DEVELOPER, CONT~J%CTOR, 'and <br /> SUBCONTRACToR(S), or anyone directly or indirectly employed by any of <br /> them or anyone for whose acts a~y of them may be liable. <br /> <br /> <br />