My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19870105
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1987
>
AG19870105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:13 AM
Creation date
11/27/2017 12:08:53 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/5/1987
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. The Applicant shall employ et his own proper cost and exponse a Profes- <br /> sional ~ngineer registered in North Carolina who shall design, lay out <br /> and supervise the construction of these certain water lines. Complete <br /> plans and profiles detailing all proposed construction and equipment <br /> must be approved by the Director prior to beginning any construction. <br /> Said construction plans shall be prepared District standard plan and <br /> profile paper as per District Standards. <br /> <br /> ?. The Applicant furthers agrees that upon approval of said Contractor <br /> and water plans by the Director the owner of said properties request- <br /> ing water service shall guarantee the installation of the required <br /> water system. U~on completion of the water system as described, <br /> written notice thereof shall be given by the Applicant to the Director, <br /> who shall cause a final inspection of the water system to be made and <br /> shall within thirty (IQ) days accept the system for the District, <br /> provided all stipulations of this contract have been met. <br /> <br /> 8. After completion of all construction, the Applicant shall furnish the <br /> original drawings of all construction plans, revised to show any and <br /> all revisions encountered during construction, to the District marked <br /> "As-Built". The final plans shall show the actual condition in which <br /> the facility was physically constructed and/or installed. Further, the <br /> final plans shall show the correct location of the facility as it <br /> relates to easements, right-of-way lines, property lines, buildings, <br /> underground and/or overhead utility lines, roadways, railroads, and <br /> all other physical features that would have any effect or i~fluence <br /> upon the constructed facility. The Professional Engineer employed <br /> to design the facility shall be responsible for the accuracy and <br /> Completeness of the facility as shown on the final edition of the <br /> original Coustructiou plans. These original drawings shall become <br /> ~he property of the District. <br /> <br /> 9. It is understood and agreed that when the described water system is <br /> constructed according to the plans, specifications, and standards of <br /> the District, said water syste~ shall automatically become the property <br /> of the District without cost to the District, and without further <br /> agreement in connection therewith. <br /> <br />.10. ~he Applicant, having constructed the aforesaid water system at his <br /> own prgper cost and expense and outside the District's standard policy <br /> for water extensions, agrees to waive all claim~ for compensation or <br /> monies refundable for any capital facilities Constructed. <br /> <br /> ll. Indemnification of ~he District. The Applicant will indemnify, hold <br /> harmless and keep harmless, the District and its agents and employees <br /> from and against all claims, damages, losses and expenses - including <br /> attorney's fees - arising out of or resulting from the performance of <br /> the work, provided that any such claim, damage, loss or expense is <br /> attributable to bo~ily injury, sickness, disease or death, or to injury <br /> to or destruction of tangible property including the loss of use <br /> resulting therefrom, and is caused in whole or in part by any negligent <br /> or willful act or omission of the A~.PLICANT, LICENSED UTILITY CONTRACTOR, <br /> AN~ SUBCONTRACTOR {S) thereof or anyone directly or indirectly employed <br /> by any of them or anyone for whose acts any of them may be liable. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.