My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19870202
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1987
>
AG19870202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:13 AM
Creation date
11/27/2017 12:08:59 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/2/1987
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 14, 1987 <br /> <br /> Board of County Commissioners <br /> Cabarrus County <br /> Post Office Box 707 <br /> Concord, North Carolina 28025 <br /> <br /> Attention:Mr. Charles McGinnis <br /> County Manager <br /> <br /> Re: Coddle Creek Reservoir <br /> Preliminary Engineering Report <br /> <br /> Dear Mr. McGinnis: <br /> <br /> As requested, HDR Infrastructure, Inc. of North Carolina {HDR) hereby <br /> offers its services to perform the Preliminary Engineering Report for <br /> ~ the Coddle Creek Reservoir for Cabarrus County. It is proposed that <br /> ~ · tile work be accomplished in accordance with our August 27, 1985, <br /> Agreement for Miscellaneous Engineering Services. The scope of work <br /> follows: <br /> SCOPE OF WORK <br /> lhe following engineering services will be provided for the project: <br /> <br /> 1. Review available engineering reports and studies on the <br /> proposed Coddle Creek reservoir and dam. Location of dam <br /> is approximately 700 L.F. north of NC 73 on Coddle Creek. <br /> <br /> 2. Based on available data, prepare an engineering evaluation <br /> of the need for the storage facility, yield of reservoir, <br /> full reservoir level, property acquisition line criteria, <br /> and construction cost estimate. <br /> <br /> 3. Prepare a Pl'eliminary Engineering Report containing the <br /> following: <br /> <br /> a. Area to be Served. Describe - give natural <br /> boundaries, major obstacles, elevations, need for <br /> facility, and other pertinent information. Use maps <br /> and sketches as necessary. <br /> <br /> b. Existing facilities. Describe - include condition, <br /> suitability for continued use of existing facilities, <br /> adequacy of water supply, storage, and transmission <br /> facilities. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.