My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19870421
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1987
>
AG19870421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:14 AM
Creation date
11/27/2017 12:09:19 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
4/21/1987
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Charles McGinnis <br />March 24, 1987 . , <br />page 2 <br /> <br /> On October 1, 1986, we requested soil bearing infor- <br /> mation by means of either obtaining test borings or <br /> using information developed for the construction of the <br /> existing Jail' and/or courthouse. This information was <br /> received at our office on March 20, 1987, and is vital <br /> to the completion of arch/tectural as well as structural <br /> drawings and specifications. <br /> <br /> 2. Probable Construction Cost <br /> <br /> The directive in our initial meetings with Cabarrus <br /> County was to keep the construction cost of the prsposed <br /> addition below $1,800,000. In my call to you on <br /> February 25, 1987, I indicated that we were concerned <br /> that because of changes to the initial scope of work, <br /> the budget was in ell likelihood being exceeded. We <br /> started the process of developing a new cost estimate on <br /> that date and most recently received input on estimated <br /> costs for food service and prison equipment from spe- <br /> cialists in those fields. <br /> <br /> In short, our current estimates indicate a construction <br /> cost of between $2,400,00 and $2,600,000. <br /> <br /> The changes in the scope of work that impacted the projected <br />costs include the following: <br /> <br /> 1. The expanded recreation/multi-purpose room initially <br /> designed to be bid as an add alternate was requested to <br /> be part of the base project by the Department of Human <br /> Resources at our June 4, 1987, review. This in turn <br /> added the same amount of area on the first floor to be <br /> used as support space for the proposed facility. <br /> <br /> 2. Approximately 1/3 of the total area of the first floor <br /> in the existing jail is to be renovated. <br /> <br /> 3. The existing intercom is to be replaced. <br /> <br /> 4. There is a 10,000 gallon gas tank that must be removed <br /> and replaced with compacted fill that was not indicated <br /> on prior site surveys. <br /> <br />CB70323.2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.