Laserfiche WebLink
m <br /> <br /> 1,4.2. Issue addenda as appropriate to interpret, clarify, or expand the <br /> Bidding Documents. <br /> <br /> 1.4.3. Attend the bid opening, prepare bid tabulation sheets, and assist OWNER <br /> in evaluatin§ bios dr proposals and in assembling and awarding contracts for <br /> construction, materials, equipment, and services. <br /> <br /> 1.5 Construction Phase - Administration of the Construction Contract <br /> <br />During the Construction Phase, ENGINEER shall: <br /> <br />1.5.1. Consult with and advise OWNER and act as OWNER's representative as set <br />forth herein and as provided in the ENGINEER's General Conditions and <br />Supplementary General Conditions of the Standard Documents of the Construction <br />Contract. <br /> <br />1.5.2. Make periodic visits to the site to observe the progress and quality of <br />the executed work and to determine in general if the work is proceeding in <br />accordance with the Contract Documents. ENGINEER will not be required to make <br />exhaustive or continuous on-site inspections to check the quality or quantity <br />of the work. ENGINEER will not be responsible for the construction means, <br />methods, techniques, sequences, or procedures or the safety precautions inci- <br />dent thereto. ENGINEER s efforts will be directed toward providing assurance <br />for OWNER that the completed project will conform to the requirements of the <br />Contract Documents, but ENGINEER will not be responsible for the Contractor's <br />failure to perform the construction work in accordance with the Contract <br />Documents, During such visits and on the basis of ENGINEER's on-site observa- <br />tions as an experienced and qualified design professional, ENGINEER will keep <br />OWNER informed of the progress of the work, will endeavor to alert OWNER to <br />defects and deficiencies in the work of the Contractor, and may disapprove or <br />reject work as failing to conform to the Contract Documents. <br /> <br />1.5.3. Review and approve or take other appropriate action in respect of Shop <br />Drawings, samples, and other data which Contractor is required to submit, but <br />only for conformance with the design concept of the PROJECT and compliance with <br />the information given in the Contract Documents. Such reviews and approvals or <br />other action shall not extend to means, methods, techniques, sequences, or <br />procedures of construction or to safety precautions and programs incident <br />thereto. <br /> <br />1,5.4. Act as initial interpreter of the requirements of the Contract Docu- <br />ments and judge of the acceptability of the work thereunder and make decisions <br />on all claims of OWNER and Contractor relating to the acceptability of the work <br />or the interpretation of the requirements of the Contract Documents pertaining <br />to the execution and progress of the work. ENGINEER shall not be liable for <br />the results of any such interpretations or decisions rendered in good faith. <br /> <br />1.5.5. Based on ENGINEER's on-site observations as an experienced and <br />qualified design professional and on ENGINEER's review of the Contractor's <br />applications for payment and supporting data, ENGINEER will determine the <br />amount owing to the Contractor and approve in writing payment to the Contractor <br />in such amounts. Such approvals of payment shall constitute a representation <br />to OWNER, based on such observations and review, that the work has progressed <br />to the point indicated and that, to the best of ENGINEER's knowledge, <br /> <br /> -4- <br /> <br /> <br />