My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19870908
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1987
>
AG19870908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:09 AM
Creation date
11/27/2017 12:09:55 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/8/1987
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2.3, Through the observations by such Field Representatives, ENGINEER shall <br />endeavor to provide further protection for the OWNER against defects and <br />deficiencies in the Work, but the furnishing of Such PROJECT representation <br />shall not modify the rights, responsibilities or obligations of E~GINEER as <br />described in Construction Phase - Administration of the Construction Contract. <br /> <br />2.3 Other Additional Services. <br /> <br />2.3,1. Services r~sulting from significant changes in the general scope, <br />extent or character of the PROJECT and revising previously accepted design <br />documents or Contract Documents when such revisions are required by changes in <br />laws, rules, regulations, ordinances, codes or oraers enacted subsequent to the <br />preparation of such documents, or are due to any other causes beyond ENGINEER's <br />control. <br /> <br />2.3.2. Providing any type of property surveys or related engineering services <br />needed for the transfer of interests in real property. <br /> <br />2.3.3. Assistance in connection with bid protests, rebiUding or renegotiating <br />contracts for construction, materials, equipment or services. <br /> <br />2.3.4. Preparing to serve or serving as a consultant or witness for OWNER in <br />any litigation, arbitration or other legal or administrative proceeding <br />involving the PROJECT. <br /> <br />2.3.5. Additional or extended services during construction made necessary by <br />(1) work damaged by fire or other cause ~uring construction, (2) a significant <br />amount of defective or neglected work of any Contractor, {3) acceleration of <br />the progress schedule involving services beyond normal working hours, (4) <br />default by any Contractor, and (5) failure of Contractor to complete the Work <br />within the time stipulated in the Contract Documents. <br /> <br />2.3.6. Preparation of operating, maintenance and staffing manuals and <br />assisting OWNER in training OWNER's staff to operate and maintain the PROJECT. <br /> <br />SECT)ON 3 - OWNER'S RESPONSIBILITIES <br /> <br />OWNER shall do the following in a timely manner so as not to delay the services <br />of ENGINEER. <br /> <br />3.1. Designate in writing a person to act as OWNER's representative with <br />respect to the services to be rendered under this Agreement. Such person shall <br />have complete authority to transmit instructions, receive information, <br />interpret and define OWNER's policies and decisions with respect to ENGINEER's <br />services for the PROJECT. <br /> <br />3.2. Assist ENGINEER by placing at disposal all available information <br />pertinent to the PROJECT including previous reports and any other data relative <br />to design or construction of the PROJECT. <br /> <br /> -6- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.