My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19870908
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1987
>
AG19870908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:09 AM
Creation date
11/27/2017 12:09:55 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/8/1987
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ B. Project No. 2A - Coddle Creek Interceptor , U.S. 29 to Wedoin§ton <br /> Road: This project is a continuation of Project lA up COddle <br /> Creek to Wed~ington Road. It consists of approximately 13,500 LF <br /> of 12-inch and 24-inch interceptors anQ 40,000 LF of collector <br /> sewer serving an estimated population of 870. The project cost <br /> -- is estimated to be $3,010,000. <br /> <br /> - C. Projects 3A~ and 3B - RockS River interceptor - Coddle Creek to <br /> U.S. 29: This project includes approximately 20,600 LF of 30- <br /> inch interceptor along Rocky River from the existing interceptor <br /> up to Roberta Church Road and approximately 13,400 LF of collec- <br /> tors serving existing developed areas. The estimated cost of <br /> this project is $2,983,000, and the estimated population is i30. <br /> <br /> - D. Project 4A - RockS River Interceptor - U.S. 29 to I-B5: This <br /> project includes approximately 18,000 LF of 24-inch and 3,000 LF <br /> -- of 12-inch interceptor from U.S. 29 to 1-05. The estimated <br /> population served is 650, and the estimated project cost is <br /> $2,093,000. <br /> <br /> E. Project 5A - Muddy Creek Interceptor and Treatment Plant: This <br /> project serves a portion of the lower study area with approxi- <br /> mately 22,400 LF of 12- and 15-inch interceptors and <br /> ~ approximately 58,400 LF of collectOrs in Currently develope~ <br /> <br /> areas. This area discharges to Rocky River below the regional <br /> wastewater' treatment plant. Therefore, a 0.5 MGD treatment plant <br /> <br /> is proposed on Rocky River to handle the waste from this portion <br />mi of the study area. Tl~e estimated population served 650, <br /> is <br /> and <br /> <br /> estimated project cost is $4,605,000. <br /> <br /> F. Projects 6A - 6C - Irish Buffalo Creek Basin: These projects are <br />Ii three separate projects consisting of collectors serving existing <br /> developed areas near the existing Irish Buffalo Creek inter- <br /> ceptor. They consists of a total of approximately 117,700 LF of <br />i collectors and 5,500 LF of 12-inch interceptors serving an <br /> <br /> · <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.