Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> CODDLE CREEK INTERCEPTOR <br /> <br /> (US HIGHWAY 29 TO WEDDINGTON RD) <br /> <br /> NOVEMBER 21, 1986 <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br /> 24" SEWER 10,500 LF $55.00 <br /> 15" SEWER 0 LF 55.00 <br /> 12~' SEWER 5,000 LF 52.00 ~6,000 <br /> 8" SEWER 40~000 LF 27.00 1~080~000 <br /> 4' DIA MANHOLES 178 EA 1~500.00 231~400 <br /> 42" SCP (BORED OR TUNNELED) 500 LF 240.00 72,000 <br /> 24" SCP (BORED) ~00 LF 80.00 48,000 <br /> l~" SOP (BORED) 1200 LF &O. O0 .72,000 <br /> PUMP STATION (TYPE A) 1 EA 25,000.00 25,00C <br /> 6" FORCE MAIN 700 LF 10.00 7,000 <br /> SEEDING 1~ AC 1)600.00 50,400 <br /> <br /> SUBTOTAL $2,218,500 <br /> CONTINGENCIES 532,700 <br /> <br /> CONSTRUCTION ~OST $2,551,000 <br /> <br /> ENGINEERING, LEGAL & <br /> ADMINISTRATIVE <br /> LAND 76,000 <br /> <br /> PRO~ECT COST ~5,010,000 <br /> <br />-- HDR ]NFRASTRUCTUPc ~- c,~ c~,~,~,-~ .... <br /> <br /> <br />