Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> ROCKY RIVER INTERCEPTOR <br /> <br /> (CODDLE CREEK TO NC 49) <br /> <br /> NOVEMBER 21~ 198& <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br />50" SEWER 14,600 LF $66.00 $9&5,600 <br />24" SEWER 0 LF 55.00 0 <br />$" SEWER 5~000 LF 27.00 155~000 <br />5' DIA MANHOLES 49 EA 2,000.00 98,000 <br />4' DIA MANHOLES 17 EA 1,500.00 22,100 <br />48" SCP (BORED OR TUNNELED) 500 LF ~00.00 150,000 <br />24" SCP (BORED) 0 LF 80.00 0 <br />16" SCP (BORED) 500 LF 60.00 18,000 <br />SEEDING 20 AC 1,600.00 52,000 <br /> <br /> SUBTOTAL $1~418,700 <br /> CONTINGENCIES 212,500 <br /> <br /> CONSTRUCTION COST $1,651,000 <br /> <br /> ENGINEERING, LEGAL & <br /> ADMINISTRATIVE 245,000 <br /> LAND 80~000 <br /> <br /> PROJECT COST $1,~56,000 <br /> <br /> <br />