Laserfiche WebLink
CABARRUS COUNTY <br /> - PROPOSED SEWER FACILITIES <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> .FOR <br /> <br /> ROCKY RIVER INTERCEPTOR <br /> <br /> (NC 49 TO ROBERTA RD) <br /> NOVEMBER 21, 1986 <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRIC~ COST <br /> <br /> 30" SEWER 6~'000 LF ~66.00 $596,000 <br /> 24" SEWER 0 LF 53.00 0 <br /> S" SEWER 8~400 LF 27.00 226~B00 <br /> 5' DIA MANHOLES 20 EA 2~000.00 40~000 <br /> 4' DIA MANHOLES 29 EA 1,500.00 37,700 <br /> 48" SCP (BORED OR TUNNELED) 100 LF 500.00 50,000 <br /> 24" SCP (BORED) 0 LF 80.00 0 <br /> 16" SOP (BORED) ISO LF 60.00 9,000 <br /> SEEDING 8 AC l~&O0. O0 12~800 <br /> <br />· SUBTOTAL ~752,500 <br /> . CONTINGENCIES 112,S00 <br /> <br /> CONSTRUCTION COST $865,100 <br /> <br /> ENGINEERING, LEGAL & <br /> ADMINISTRATIVE 129~900 <br /> LAND 52~000 <br /> <br /> PRO~ECT COST ~1,027,000 <br /> <br /> <br />