My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19871207
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1987
>
AG19871207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:13 AM
Creation date
11/27/2017 12:10:13 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/7/1987
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID OPENING <br />MEETING MINUTES 11.23.87 <br /> <br />ADDITIONS & ALTERATIONS <br />CABARRUS COUNTY JAIL <br /> <br />Negotiated Plumbing Bid Opening - 2:00 P.M. <br />November 23, 1987 <br />County Manager's Office <br /> <br />Present at Meeting: <br /> <br /> Blair Bennett - Finance Director <br /> Robert Canaday -County Sheriff <br /> Larry Anderson - Deputy Sheriff <br /> Douglas M. Zawiskie - Kimball Associates, P.A. <br /> <br />Purpose of Meeting: <br /> <br />Opening of two expected negotiated C-3 plumbing contract bids. <br /> <br /> 1. The follow.ing single bid was received: <br /> <br /> Piping, Plumbing Mechanical Contractors Inc. $377,879.00 <br /> <br />Cumulative project cost including previous low bids received <br />10.20.87: <br /> <br /> (C-l) General COnstruction $1,452,750.00 ~ <br /> (C-2) HVAC Construction 182,855.00 ~ <br /> (C-3) Plumbing Construction 377,879.00 - ~ <br /> (C-4) Electrical Construction 185,600.00 <br /> (C-5) Prison Equipment Work 1,037,651.00 ~'~t, <br /> $3,236,735.00 <br /> <br />This exceeds the owner's maximum budget amount by $236,735.00. <br /> <br />Sheriff Canaday noted the following concerning the ~ , <br />Stewart-Decatur November 13, 1987, letter outlining cost-saving~ <br />measures for contract C-5, PriSon Equipment (see attached). <br /> <br /> Item No. 1 -- Acceptable. Cost savings of $5,000.00. <br /> <br /> Item No, 2(a) -- Unacceptable. This would change the design <br /> intent. <br /> <br /> Item No. 2(b) -- Acceptable. Cost savings of $3,400.00. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.