Laserfiche WebLink
Item No. 3(a) & (b) -- Unacceptable. This would obscure <br /> guard's field of vision. <br /> <br /> Item No. 4(a) & (b) -- Unacceptable. This would change the <br /> design intent. <br /> <br /> Item No. 5 (a) & (b) -- Unacceptable. This would change the <br /> design intent. <br /> <br /> Acceptance of item no. 1 and item no. 2(b) will reduce the <br /> project cost to $3,228,335.00. <br /> <br />The A/E noted that the project's present C-1 (General <br />Construction) low bidder is going to forward possible cost <br />savings options for the owner's review and consideration. <br /> <br />The A/E also noted that he would be present at the commissioner's <br />meeting scheduled for December 7, 1987, to review these and any <br />subsequent results. <br /> <br />DMZ:ts <br />Encl. <br /> <br />cc: Charles McGinnis <br /> Sheriff Canaday <br /> Captain Anderson <br /> Blair Bennett <br /> L. Robert Kimball <br /> Csaba S. Balazs <br /> Robert J. Zakrzwski <br /> Jerry Kabala <br /> <br />CC7t130.2 <br /> <br /> <br />