Laserfiche WebLink
I <br /> <br /> ~1~ STEWART- DECATUR sECURITY SYSTEMS In¢, <br /> <br /> ~' NOV 1 ~t9R7 <br /> <br /> A~D A~S£CiATgS <br /> · Mr. Doug Zawiskie EBEi'iSSURG, P~NN~ <br /> L. Robert Kimball & Associates <br /> 615 W. Highland Avenue <br /> Ebensburg, PA 15931 <br /> <br /> Reference:Additions & Alterations CABARRUS COUNTY JAIL <br /> Project No. 86-0153-171 <br /> Contract No. C-5 Prison Equipment <br /> <br /> Good Morning Doug: <br /> <br />In..response to your request for value engineering suggestions <br />to reduce project cost in the Detention Equipment, we offer the <br />following for your consideration. <br /> <br /> 1. Detail 14 on PE-D1, eliminate 3 x 4.1 Channels and use <br /> Stewart-Decatur's standard Formed Battons (see Detail <br /> attached). This will eliminate approximately 8,28~ oounds <br /> of channel and give a total cost savings of $5,000.00~ <br /> <br /> 2. Substitute our standard Observation & Speaking Panels in <br /> lieu of specified Details on prints PE-S1 and PE-F1 and <br /> Section 11190-44, 3.11F and Section 11190-45, 3.11 J. <br /> Details of our standard are attached. <br /> <br /> a. Substitute (11) Observati6n/Speaking Panel~ in Visitor <br /> Booth, for a total cost savings of $3,000.00. <br /> <br /> b. Substitute Observation Panels and Shutters in Plate <br /> Doors and Dayroom Walls, for a total cost savings of <br /> $3,~00.00. <br /> <br /> 3. Substitute Hollow Metal Galvanized Steel Door and Frame for <br /> Aluminum Door & Frame ~E129, 1St, Floor, use same Hardware. <br /> <br /> a. Substituting Galvanized Steel Door & Frame and omitting <br /> Transom Lite, for a total cost savings of $2,500.00. <br /> <br /> b. Substituting Galvanized Steel Door & Frame with Transom <br /> Lite, for a total cost savings of $2,000.0~. <br /> <br /> 1360 DOLWICK DRIVE , P.O. BOX 18700 · ERLANGER, KENTUCKY 41018-0700 <br /> <br /> Phone: (606) 371-8000 Telex: 56-0691 Facsimile; (606) 371-5250 <br /> <br /> <br />