Detailed Scope of Work - <br />Phase 1 <br />Page 5 <br /> <br />Task E: Solid Waste Processing Alternatives <br /> <br />Task £stablish the best design concept, technology and "risk-free" system <br />Objective for processing ~he solid vaste in keeping with the design criteria <br /> established in Task D. <br /> <br /> Initial Screening <br /> <br /> I review of technology applicable to the facilities determined in <br /> Tasks A, B, C, and D will be perfo.rmed. The systems will then be <br /> investigated in depth as follows: <br /> <br /> In Depth Analysis <br /> <br /> Prepare a conceptual design of the total waste-to-energy systems <br /> defined in the initial screening. <br /> <br /> Obtain floor plans, schematic layouts, and flow diagram of the <br /> processes used in the waste-to-energy system to develop cost <br /> estimates and site location; calculate energy and material balances <br /> and system reliability in light of energy user requirements to <br /> establish net co~odities that will be soldI determine properties of <br /> outputs and residuals of the processI incorporate transportation a~d <br /> transfer costs of the waste fuel into the o~lnS and operating costs <br /> of the facility to determine overall system cost, <br /> <br /> Determine properties of energy output of these processes. <br /> <br /> Determine properties of the residual wastes produced by the <br /> processes. <br /> <br /> Prepare an analysis of the economic viability of the project to <br /> include consideration of total capital costs, operating and <br /> maintenance costs, and a total revenue requirement. <br /> <br /> Prepare en estimate of the total project cost ~hich ~ould include <br /> construction cost, contingency, allowance for start-up, financing <br /> costs, capitalized interest, reserve funds and bond fund, if an)'. <br /> Prepare an estimate of total operating and ~aintenance costs <br /> associated with the norms1 operation of the project. Prepare an <br /> estimate of the total annual revenue requirement, including payment <br /> in lieu of taxes, if any, and project management fee. Prepare an <br /> estimate of the energy, materials and disposal charges of the project <br /> as compared to existing prices for energy, materials and solid waste <br /> disposal. <br /> <br /> <br />