My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19850218
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1985
>
AG19850218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:13:57 AM
Creation date
11/27/2017 12:11:34 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/18/1985
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Detailed Scope of Work <br />Phase 1 <br />Page 6 <br /> <br /> Cogenerstion <br /> <br /> The feasibility of co-generation viii be investigated. The <br /> generating potential of the facility will be deter~ined with cost <br /> estimates for t~e addition of co-generation equipment. Revenue <br /> projections rill he made for the sale of electric pover and/or cost <br /> avoidance savings from using generated power /n-house. <br /> <br />Task C: Plant Siting Analysis <br /> <br />Task Establish the optimum site(s) in terms of economics~ public relations <br />Ob~ective: and environmental impact. <br /> <br /> This effort will include the folloving: <br /> <br /> -Identify and visit potential sites for location of resource recovery <br /> facilities. <br /> <br /> -Evaluate individual sites for contour and terrain, and co~patability <br /> ~ith tie energy recovery process. <br /> <br /> -Rete the sites on location with ~espect to generation centers and <br /> accessibility to major road netvorks. <br /> <br /> -Evaluate the potential sites for comparability of proposed facility <br /> with existing surroundings. <br /> <br /> -Evaluate the location of the proposed facility sites in relation to <br /> existing or future sanitary landfill locations. <br /> <br />Task D: Analysis of Plant Capacity, Hodular Arrangement and Energy Recovery <br /> Potential. <br /> <br />Task Establish the plant design capacity and criteria as to number of <br />Objective: individual units, standby requirements, level of reliability and <br /> energy production/materials recovery. <br /> <br /> Results of Tasks A, B, and C viii provide the decision-making input <br /> regarding design criteria. <br /> <br /> Technology Screening and review viii provide intelligence regarding <br /> energy/~2terials output potential. <br /> <br /> geco~endations rill be made on the preferred methods of <br /> transportation off HS~ to the site. A separate transportation <br /> analysis ~ill be made for each governmental body involved in the <br /> facility. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.