Laserfiche WebLink
Attachment II. B. 2. <br /> <br /> -Bakers Creek Con~nunity Park <br /> Cost Estimates <br /> <br />Tennis Area <br /> <br />{1) Lighting System on (4) Tennis Courts $14,000.00 <br />Picnic Area <br /> <br />{1) Picnic Tables 45 @SIOD.'OD 4,500.00 <br />{2) Grill~' 13 @$150.0D 1,gSO.O0 <br />(3) Trash Receptacles 20 @$100.00 2,000.00 <br />(4) Picnic Site Preparation 1,550.0D <br /> <br />Road~ay/Parkin9 <br /> <br />(1) 800 LF Paved Surface 25,00D.00 <br />(2) lOD Parking Spaces 15,DO0.O0 <br /> <br />Playlot Equipment <br /> <br />(1) Swings 800.OD <br />(2) Wooden Play Apparatus 5,0DO.DD <br />{3) Site Preparation/Timber Edging 1,ODD.OD <br />(4) Coil Spring Toys 1,O00.~D <br />(5) Slide 750.09 <br />(6) Whirlwind 500.00 <br />{7) Bench/Landscaping 950.0D <br /> <br />Toilet/Canteen Building <br /> <br />(1) Security System in B~ilding 2,00D.O0 <br /> <br />Walking/Jogging Trail System <br /> <br />(1) Timber Edging/Gravel/Site Preparation lO,O00.OD <br />Support Facilities <br /> <br />(1) Landscaping 4,0OD.OD <br />(2) Electrical Lighting System 6,0DD.~D <br />(3) Landscaping/Benches 4,0DO.OD <br /> $100,000.00 <br /> Contingency 10,ODD.OD <br /> Total Project Cost llO,O00.O0 <br /> <br /> <br />