Laserfiche WebLink
Plumbing m <br /> <br /> Change Tie in building sewer to <br /> exist building sewer $ 708.00 <br /> Change P-6 to HawSey Taylor WMgA- <br /> Add $65.00 <br /> Delete P-5 On Second Floor~ rough-in <br /> Plumbing to floor line $ 800.00 <br /> <br /> Recommended deductions to Plumbing <br /> Construction Baseboard. $ 1~443.00 <br /> <br /> Mechanical <br /> <br /> Delete Smoke detectors in duct work $ 2,735.00 <br /> Delete Air bslancing requirements by <br /> others $ 1,500.00 <br /> Delete RG-7 in Basement and 24" X 12" <br /> transfer duct $ 138.00 <br /> Delete EUH-1 and Thermostat in Basement $ 220.00 <br /> Delete VAVA in room 114 $ 200.00 <br /> Delete SuPply to four toilets and stairs $ 475.00 <br /> Delete WH-1 and WH-2 ~ Lobby $ 185.00 <br /> Delete Return air transfer duct @ First <br /> floor $ 10.00 <br /> Delete PRV-2, Duct and Grille $ 570.00 <br /> <br />Recommended Deductions to Mechanical <br />Construction Base Bid $ 6~035.00 <br />Electrical <br /> <br />Delete SA fixture and base $ 1,600.00 <br />Change SB fixtures to above ground type $ 560.00 <br />Change F-10 fixtures to F-9 fixture $ 500.00 <br />Change Peerless pendant mounted fixtures <br /> to Linear Lighting fixture $ 7,400.00 <br />Delete Fluorescent lighting in sign <br /> maintenance 004 $ 352.00 <br />Delete Wiring to EUG-1 $ 130,00 <br />Change Ail second floor pendant mounted <br /> fixtures to F-9 fixtures $ 2,938.00 <br />Delete Wiring to PLV-2 $ 100.00 <br /> <br />Recommended Deductions to Electrical <br />Construction Base Bid $13,580.00 <br /> <br />Total Recommended deductions all contracts $94,360.00 <br /> <br />2. The owner ma)' elect to delete the following additional <br />items to further reduce the project cost. <br /> <br /> <br />