Laserfiche WebLink
Delete All paint outside of core area <br /> on second floor $ 1,814.00 <br /> Delete GWB partitions outside of core <br /> area on second floor $ 3,780.00 <br /> Delete Accoustical tile ceiling on <br /> second floor $ 3,538.00 <br /> Delete 6-HM door frames $ 240.00 <br /> Delete Hardware for six doors $ 300.00 <br /> Delete Six wood doors $ 300.00 <br /> Delete Toilet Accessory TA-5 $ 328.00 <br /> Delete Csnopy on south elevation $ 5,600.00 <br /> <br /> Additional deduction to General Construction Base Bid $16,700.00 <br /> Mechanical Construction <br /> <br /> Delete Transfer grille in rooms <br /> 214, 215, 216 $ 125,00 <br /> <br /> Additional deductions to Geaeral Construction Base Bid $ 125.00 <br /> Electrical Construction <br /> <br />Delete All lighting on second floor out- <br /> side core $ 5,185.00 <br /> Delete Ail receptacles and telephone <br /> outlets on interior walls and <br /> <br /> on exterior walls $ 2~050.00 <br /> <br /> Additional deductions to Electrical Construction Base Bid $ 7,235.00 <br /> Total Additional Deductions all contracts $23,260.00 <br /> <br />3. We do not recommend that the owner exercise his option <br /> to take the following deductions that they are not <br /> cost effective and must be replaced hack into the pro- <br /> ject for the owner to use the second floor of the <br /> building. <br /> <br />Mechanical Construction <br /> <br />Delete Second Floor Mechanical Duct out- <br /> side of the core area and RTU-2-4 <br /> and 2-3 $ 4,380.00 <br /> <br />Deduction not recommended to Mechanical Construction Base Bid $ 4,380.00 <br />Electrical Construction <br /> <br />Delete Wiring and disconnect to RTU-2-4 <br /> 2-2 and 2-3 $ 800.00 <br /> <br />Deductions not recommended to Electrical Construction <br />Base Bid $ 800.00 <br /> <br /> <br />