Total deductions, not recommended, for all contracts $5~80.0~ <br /> <br /> WITH WITH <br /> WITH ADDITIONAL DEDUCTIONS <br /> BASE RECOMMENDED DEDUCTIONS NOT <br /> BID DEDUCTIONS TAKE~ REC~ENDED <br />]enerml Construction $370,238.00 $296,936.00 $281,2~4.00 $281,274.00 <br />Plumbing Construction $ 19,825.00 $ 18 382.00 $ 18,382.00 $ 18,382.00 <br /> <br />Mechanical Construction $ 59 975.00 $ 53,940.00 $ 53,815.00 $ 49,435.00 <br />Electrical Construction $ 54 300,00 $ 40,720.00 $ 33~485.00 $ 32,685.00 . <br />FOTAL $504,338.00 $4~09,978.00 $386t956.00 $381,776.00 <br /> <br /> In addition to the above cost deductions, it will be <br /> necessary to add approximately $9,500 to the overall <br /> project cost to carpet the first floor and the second <br /> floor area outside the unassigned area. <br /> <br /> If the owner does not elect to develop the second floor <br /> outside of the core area, the approximate cost of car- <br /> peting the first floor will be $6,300. <br /> <br /> We would recommend that the owner provide some additional <br /> funds for contingencies which may arise during the pro- <br /> ject. For example, to add unit costs items to the pro- <br /> ject or unforeseen conditions such as unsuitable material <br /> for foundations below existing floor slabs, etc. <br /> <br /> The above list represents the current status of our <br /> negotiations. We are continuing to negotiate further <br /> deductions and will do so until the February 6 meeting. <br /> Bowevel, this is the summary of the deductions that we <br /> are able to obtain as of this date. <br /> <br /> Please forward a copy of this information to Mr. 3im <br /> Lentz and Mr. archie Barnhardt for their review. <br /> <br /> Sincerely, <br /> <br /> ~~~~/~BRAMS SCHLETZBAUM <br /> JS/v¥ <br /> <br /> <br />