m
<br />-'.,' - , ~_: ~i" SECTION B-COMPENSATION FOR ENGINEERING SERVICES . .::,~i~:'~:~:!:~!L'i/
<br />
<br /> Three thousand Dollm($ ~)000.00 )
<br /> after the review and approval of the preliminary engineering report by fha O~ER and FmHA.
<br />
<br /> 2. The OWNER shaU compensate tile ENGINEER for design and contract administrarion engineering servicea in the
<br /> amount of: (Select la) or (bi)
<br />
<br /> (a) See item b below Dollats(S )or
<br /> (b) As showninAttaclunent I and as stipulated in SECTION F.
<br /> When Attaclunent I is used lo establish compensation for the design and contract admin~st~'alion ~,~,'ices, tile
<br /> actual construction costs on which compensation is determined shall exclude legal fees. admimstrative costs,
<br /> engineering fees, land righls, acquisition costs, water costs, and interest expense incurred during lite construc-
<br /> tion period.
<br />
<br /> 3. The compensarion for prelimlna~y engineering services, design and conlracl administration services shall be payable
<br /> as follows:
<br /> (al A sum xvhich equals seventy percent (70~) of tile lotal COlnpensation payable nnder Section B-I and 2, after
<br />
<br /> and tile accel)lance of tile same by OWNER and FlnllA.
<br />
<br /> (bi A sum which, h)gelber willl tile conlpeusation plovJded iu .%etlon ll-3-{a) ablwe, equals eighty percent (X0'l)
<br />
<br /> lc) A sin eqnal Io fifteen percent (I 5%) of Ihe compensation ,.,.'iii be paid on a monthly basis for general engineering
<br /> review of the contractor's work during tile construction period on percentage ratios identical to those approved
<br /> by the ENGINEER as a basis upon which lo make partial paymenls to tile contractor(s). Hov,'e,.'er. payment
<br /> under this paragraph and of such additional sums aa are due tile ENGINEER by reasc, n of any necessary ad-
<br /> justments in the payment computations will be in an amount st', that tile a~regate of all sums paid Io tile ENGI.
<br /> NEER will equal nblety-five (95%) of tile compensation. A final paynlent to equal 10ti percent shall be made
<br /> when it is determined that all services ~'equired by this Agreement bare been completed except for tile services
<br /> scl forth in Section A-21 hereof.
<br />
<br /> SECTION C - COMPENSATION FOR RESIDENT INSPECTION AS SET
<br /> FORTH IN SECTION A-14
<br />
<br /> When the ENGINEER provides resident inspeclion, the ENGINEER will, prior to tile preconslruclion conference,
<br /> submit a resume of lite resident inspector's qualifications, anticipated dnffes and ,esponsibilities for approval by tile OWNER
<br /> and FmHA. The OWNER agrees to pay the ENGINEER for such services in accordance v,,ith the schedule set out in SECT. ION
<br /> F . Tile ENGINEER will render to OWNER for such services an ilemlzed bill, once each month, for compensation for
<br /> soch services performed heremtder during such period, Ute same to be due and payable by Ibe OWNER to tile ENGINEER on
<br /> or before the 10th day of the following period. Under normal construction circumstances, and for the proposed construction
<br />
<br /> period of Seo S~¢Tlfi~t ~' days, tile cost of resident inspection is estimated to be $
<br /> SECTION D - ADDITIONAL ENGINEERING SERVICES
<br />
<br /> In addition to the foregoing being l~erformed, the following services may be provided UPON PRIOR WRITTEN AUTHOR-
<br /> IZATION OF THE OWNER and written approval of FmHA.
<br />
<br /> may be requited.
<br /> 2. Laboratory tests, well tests, borings, specialized geological, soils, hydraulic, or other studies recmnmended by the
<br /> ENGINEER.
<br />
<br /> .3. Property surveys, de)ailed description of sites, mapa, drawing% or estimates related thereto; a~sistance in negotiating
<br /> for bid and casement ri~ht~.
<br /> 4. Necessary data and ft]Jng mapa for water r~ht$, water adjudication, and litigation.
<br /> <~' "..':'y") ;F',tfl .'t?~.l.;' '~ ~/n'~d,-.~ ~t,,: -',-~.'t,~ :"~
<br />
<br />
<br />
|