My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19830221
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1983
>
AG19830221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:13:43 AM
Creation date
11/27/2017 12:13:39 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/21/1983
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tel.704 525.963~ August 30, 1982 <br /> <br /> Mr. Charles MoGinnis, County Manager <br /> Cabarrus Count5, Manager's Office <br /> P. O. Box 707 <br /> Concord, N.C. 28025 <br /> <br /> Re: Architectural g Engineering Services for renovations and <br /> inprovements to Cabarrus County Courthouse 8ui]ding <br /> Concord, N.C. <br /> <br /> Dear Charles: <br /> <br /> As per our conferenc% with you and Mr. John Page on August 25, <br /> 1982 we have reviewed the bai]dings plans, specifications, proposed <br /> changes, and inspected the facilities closely with Mr. Page. Ne <br /> are pleased to offer our services based on our findings, and propose <br /> the following budget For renovating ~e 11,066 sq. ft. as noted in <br /> your drawings. <br /> <br /> I. Bidding through Genera] Contractors <br /> <br /> 1!,066 sq. ft. ~ $15/sq. ft. ~166,000.00 <br /> Arch. Fee 7% .cC $166,000.00 11,000.00 <br /> <br /> TotaL $177, O00. O0 <br /> <br /> This budget is based on hooking up to existing mechanical system. <br /> It is our recomendation to go to seperate zone system using roof <br /> to tmit. This would add $15,000.00 to the construction budget, <br /> but would pay for itself in one year of energy savings. <br /> <br /> II. A]ternat Method of Construe%ion <br /> Contract Management : This method allows the mmer <br /> to get all items at direct cost without profit and overhead added <br /> to expenses by the contractor. All items directly sub t6 County <br /> for direct pay~ment. We project the costs to be as follows: <br /> <br /> 11,066 sq. ft. @ $11/sq. ft. $121,726.00 <br /> Arch. 7.5% fee standard services 9,130.00 <br /> Contract Managemen~ Fee 8,500.00 <br /> Total $139,356.O0 <br /> If roof top unit required 15,000.00 <br /> Project cost with roof unit $t54,356.00 <br /> 10 % contingency 15,435,60 <br /> Total with contingency $169~791.60 <br /> <br />/ <br /> ARCHITECTURE -- PLANNING - ENGINEERING -- MUNICIPAL CONSULTANTS <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.