My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19830221
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1983
>
AG19830221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:13:43 AM
Creation date
11/27/2017 12:13:39 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/21/1983
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
51~NodhM~eSlree~ September 3, 1982 <br />Obar~e~e. N~h Carolina 28202 <br /> <br />704/334.5425 <br /> <br /> Cabarrus County Maoager <br /> Post Office Box 707 <br /> Concord, Nortb Carolina 28025 <br /> <br /> Attn: Mr. Charles McGinnis <br /> <br /> Re: Renovations to the Existing <br /> Cabarrus County Courthouse <br /> <br /> Dear Mr. McGinnis: <br /> <br /> We are pleased to submit the following proposal for <br /> Architectural and Engineering services for the above <br /> referended project, as described in the proposal program <br /> titled Part V - Schematic Plans, proposed 1982 needs, <br /> pages~i6 thru 21. <br /> <br /> This proposal is based upon the scope of work as itemized <br /> beldw: <br /> <br /> Predesign Phase to include the preparation of ~ner-Architect <br /> contract; existing facilities survey, field measurements, <br /> evaluation of existing conditions; review of individual <br /> space requirements (electrical outlet location etc.) <br /> with department heads; code review and project administration. <br /> <br /> Sub-total this phase - 26 hr. x 40.00/hour = $1040.~ <br /> <br /> Schematic Design Development Phase to include scale drawings <br /> of basement, first and third floor record plans with <br /> new partition layout; material research of e~isting <br /> materials and finishes; coordination with consuitanta <br /> of their mechanical, electrical and plumbiug work; <br /> statement of probabe construction cost; project <br /> administration and presentation to ~eer. <br /> <br /> Sub-total this phase - 24 hr. ~ 30.00/hr = $ 720.00 <br /> 13 hr. ~ 40.00/hr = $ 520.00 <br /> <br /> ~t240 ~00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.