My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19830221
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1983
>
AG19830221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:13:43 AM
Creation date
11/27/2017 12:13:39 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/21/1983
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Charles McGinnis <br />September 3, 1982 <br />Page 2 <br /> <br />Construction Document Phase to include the following <br /> drawings; basement, first and third floor plans; <br /> finish schedule; door schednle and details; council <br /> chamber plan, elevation and details, toilet elevations <br /> and details; reflected ceiling plans; interior details, <br /> document coordination with consultants. Specification <br /> bid forms, general and special conditions, materials <br /> description and coordination with consultant specifi- <br /> cations; Project Administration, and ~,ner Architect <br /> final drawing review. <br /> <br /> Sub-total this phase - 92 hr. @ 30.00/hour = $ 2760.00 <br /> 48 hr. @ 40.00/hour = 1920.00 <br /> 16 hr. @ 18.00/hour = 288.00 <br /> $ 4968.00 <br /> <br />Bidding Phase to include recording and distribution of <br /> bid documents; return of bid deposits; addenda; <br /> answering contractors questions during bid period; <br /> addenda at bid opening; preparation of bid tabulation; <br /> b~d recommendations to ~ner; notice of contract award; <br /> preparation of ~ner/Contractor contract. <br /> <br /> Sub-total this phase - 33 hr. @ 40.00/hour = $ 1320.00 <br /> <br />Construction Administration Phase to include ~ner, Architect~ <br /> Contractor start-up and monthly progress meetings; field <br /> observation; review of shop drawings; project schedule <br /> monitoring; process application for payments; final <br /> inspection and punch list and follow-up inspection of <br /> punch list; project close out and project administration. <br /> <br /> Sub-total this phase - 16 hr. @ 18.00/hour = $ 288~.00 <br /> 66 hr. @ 40.00/hour = $ 2640.00 <br /> 2928.00 <br /> <br /> Total Architectural Service ' = $ 11496.00 <br /> <br />Plumbing, Mechanical and Electrical Engine~rin~ service will <br /> be performed by the firm of McMichael, McCracken & Lopez, <br /> Charlotte, North Carolina. The scope and sequence of <br /> their services will parallel that of the Architects <br /> and include the following: Demolition drawings as required; <br /> Determination of capacity and tie-in points to the existing <br /> plumbing, mechanical and electrical systems; evaluation and <br /> selection of the mechanical system for the third floor; <br /> construction documents; bidding assistance; construction <br /> observation (maximum of 6 visists). <br /> <br /> Total Cost for Engineering Service = $ 9704~00 <br /> <br /> Total Architectural/Engineering Fee =.$21~00.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.