Laserfiche WebLink
Mr. Charles McGinnis <br /> September 3, 1982 <br /> Page <br /> 3 <br /> <br />Ail change orders during the construction phase initiated <br />by Owner requested changes are to be billed by the Architect <br />as an additional service based on an hourly rate of $40,O0/heur <br />with the scope and cost of Architect service confirmed in <br />writing to the Owner before change order initiated. <br /> <br />Reproduction and postage cost incurred by Architect for ail <br />plans and specifications required for bidding are reimbursibie <br />to Owner at an amount of 1.1 times the amount of tile Architects <br />invoice cost. <br /> <br />The scope of this proposal does not include work involved in <br />bringing existing areas of tile building, outside of the <br />area targeted for renovations, up to standards of the latest <br />handicap or energy codes. <br /> <br />Tile estimated cost of construction for each prime contract <br />is as follows: <br /> <br /> General Contract (Cabarrus Const. est.) $ 125,000.00 <br /> Carpet allowance 15,000.00 <br /> Plumbing Contract 16,000.00 <br /> · Mechanical Contract 65,000.00 <br /> Electric,al Contract 46,000.00 <br /> <br /> Total estimated Construction Cost $ 267,000.00 <br />Very truly yours, <br /> <br />/jeb [ <br /> <br />ENC: References <br /> Resumes <br /> <br /> <br />