My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19831121
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1983
>
AG19831121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:13:48 AM
Creation date
11/27/2017 12:14:18 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/21/1983
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County reserves the right to remove, test, seal and interfere with <br /> the meter for causes deemed justifiable by the County. <br /> B~-Pass <br /> <br /> No by-pass around any meter shall be installed unless determined <br />by the County to be necessary, and installatio~ performed by the <br />County; and where such devices exist, the use of same shall be <br />re§ulated by the County. Unauthorized use of by-pass may result in <br />removal of meter as well as all other penalties, civil'or criminal, <br />provided by law. <br />Cross-Connections <br /> <br /> Cross-connections are expressly prohibited, and may result in <br />removal of meter supplying such connection as well ~s all other <br />penalties, civil or criminal, provided by law. An example of this <br />would Be the inter-connection of a well water supply with a potable <br />public water supply. Upon discovery of a cross-connection upon any <br />property being furnished water through the Cabarrus County Water <br />System, the owner of the property is to be notified that the <br />cross-connectiOn must be discontinued within thirty (30) days; and, <br />that a failure to remove or correct the cross-connection within <br />thirty (30) days will result in the removal of his meter. If the <br />correction is not made within the thirty (30) day period, the meter <br />is to be removed and is not to be reinstalled without payment of the <br />full standard meter charge, unless it has previously been paid, in <br />which case a twenty-five ($25.00) charge will be required. <br />Inspection of Plumbinq <br /> <br /> The County reserves the right to make a meter reading(s) and <br /> <br /> -5- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.