Laserfiche WebLink
with the water going to waste will be required to be metered as <br />already specified. The County reserves the right to make necessary <br />inspections to insure compliance with these regulations, and to <br />require check valves or other devices to be installed by owner. <br /> <br /> H. Cost of Service Lines and Meters <br /> <br /> Cost During Standard Meter Charge <br /> Size Sign-up (Cost after Sign-up) <br /> <br /> 3/4" $ 75.00 $250.00 <br /> 1" 200,00 300.00 <br /> 1-1/2" 360.00 600.00 <br /> 2" 450.00 700.00 <br /> Larger than 2" Cost Cost + 10% <br /> Sprinkler Cost Cost + 10% <br /> Connection <br /> <br />Pavement repair cost shall be paid in all cases where pavement <br />cutting is requireu. Larger meters may be installed to replace <br />smaller meters by paying the new larger standard meter charge, <br /> <br />IV - RATE SCHEDULES AND BILLING <br /> A, Water Rates <br /> <br /> The water rates and billing period will be established by the <br /> <br />Board of County Commissioners, and may be revised from time to time. <br />Information concerning existing water rates may be obtained from the <br />County Water Department. The water bills will be deemed Lo be <br />correct if no protest is filed within ten (10) days from date of <br />billing. <br /> <br /> -11- <br /> <br /> <br />