Laserfiche WebLink
· POST OF.VICE, BOX 159~q '~ <br />Ro~AN TECHNIC~ COL~GE e~o~ ~o4.~-o~o <br /> <br /> Concord Renovation o Estimated Cost <br /> <br /> Parking Lot <br /> 3 × Tandem Loads of Crusher Run Stone (32 tons) $ 745.00 <br /> 16 hours of tractor w/blade x $25/hr. 400.00 <br /> Stripe Lot 150.00 <br /> Landscape Timbers 300,00 <br /> $1,595,00 <br /> Ramps for Handicapped - Two @ 8' x 8' = 64 sq. ft. <br /> One Unit <br /> Plywood 66,00 <br /> 8' x 4" x 4" 40.00 <br /> 8' x 2" x 6" 30.00 <br /> Nails 10.00 <br /> Scotch Pads 100,00 <br /> 48 manhours 480.00 <br /> 6']-2-~-~.00x 2 1~452.00 <br /> <br /> Area A <br /> <br /> Wall Partitions - Large Classroom - 160 lineal feet <br /> Lumber - 2" x 4" <br /> Plates 40 <br /> Studs 120 <br /> At Doors 9 <br /> Tees 12 <br /> Bracing 10 <br /> ~x $2.50 477.50 <br /> <br /> Sheet Rock - <br /> Per Sq. Foot - <br /> Material $ .15 <br /> Filling .17 <br /> Painting .25 <br /> ~ x 3200 wall feet 1,824.00 <br /> <br /> Rubber Base .15 x 320 48.00 <br /> Door/Door Frames/Locks/Hinges @ $300 x 3 900.00 <br /> Nails 10.00 <br /> 128 manhours 1,280.00 <br /> 4,539.50 <br /> <br /> <br />